Hello Sir,
I have purchased a flat in Thane district in 2010 which consists of 3 wings namely A, B and C (G+4). Builder first constructed B wing and took part completion certificate (CC) for B wing in 2011. The map attached by builder with CC given by Municipal authority shows 1 stilt parking and 1 garage at a distance of 4.25 meters. but while taking CC for A wing in 2012 map attached shows a flat instead of stilt parking and the distance of 4.25 meters has been reduced to 1.5 meter. The actual construction is done according to map attached with A wing CC.
Does the above activity results to illegal construction as builder has changed the map and measurements after getting CC?