Or residential complex is having total 17 building oiut of which 9 are under construction and 8 building (Total 520 flats) are totally ready (OC Recd.) and given the possession. Each building has 1 enterance and more enterance too.
Our is building no 2 which has 2A and 2B wing with 140 flats owner. OC of this is recd. 15 month back and more than 70% flats are sold before receipt of OC. Builder is not interested in making society. what is remedy available??