Dear Experts,
We have a multistory building, which has been let out to different tenants.
A D.G. Set has been installed by us in the building.
Whether we have to require any consent from pollution control board under Air (Prevention & Control of polution) Act or Water (Prevention and control) of pollution Act or Environment protection Act.
Our one tenant is insisting for the consent.