hi all,
This is srinivas. I am constructing a residence in first floor. i have chosen on non-engineering local guy who use to construct residence in our city. We both mutually agreed on oral basis, that i will provide materials and he needs to finish the building and get the labour cost. there is no written agreement/contract between us.
The project cost was 6 Lakhs. out of which 3L has been loaned from LIC. we have paid 3 L as a labour charge and have detailed accounts with his signature. After 3/4th completion he stil asked 1L. we were taken aback. so he left without finishing 1/4th work. As this 1/4th includes stair case, levelling at terrace etc. He went to construction union and demanded 1L. but we never agreed to that since we have been records and we paid all the labour charges.
After 8 months, we started constructing with new engineer to finish portico and the remaining 1/4th work. Now the old one came and stopped the construction of portico. he also gave petition to the SI of poilce and screwed them.
my doubts..
1. How come the labour cost would shoot up 66 percent.? i.e the total project cost was ly 6L. how come labour cost would be 4L
2. Si of poilce has been screwed by this fellow. and asked u not to construct the portigo.
3. What is the role of income tax for that 1L?
I dont know how to deal this in legal. bcos it is based on oral agreement. can i get injection order to construct portigo ?bcos rain water peeps inside my home and more water is been staginating in the terrace due tot he lack of levelling. hope more mosquitos would breed.
pls tel me some suggtion and help me out.. urgent