Preparation

  1. Notify all affected workers that a lockout is required and the reason for the lockout.

Machine or Equipment Shutdown and Isolation

  1. If the equipment is operating, shut it down by the normal stopping procedure (depress stop button, open toggle switch, etc.). Only workers knowledgeable in the operation of the specific equipment should perform shutdown or re-start procedures.