OCCUPANCY CERTIFICATE
SAUMITRA SINHA ROY
(Querist) 29 September 2010
This query is : Resolved
I HAVE BOOKED A FLAT IN SILVASSA IN THE YEAR 2008. THE FLAT LOCATED AT SIXTH FLOOR OF THE BULDING. THE APPROPRIATE AUTHORITY GIVEN PERMISSION TO BUILDER FOR CONSTRUCTION OF FLATS. PRESENTLY THE FIRE DEPARTMENT DOES NOT GIVEN NOC ON THE GROUND THAT THEY DO NOT HAVE ADEQUTE EQUIPMENT TO DEAL WITH FIRE ABOVE 4TH FLOOR. HENCE FROM 5HT FLOOR ONWARDS OCCUPANCY CERTIFICATE NOT BEEN ISSUED BY THE GOVERNMENT. I FAILED TO UNDERSTAND WHEN THE ONE DEPARTMENT GIVING CONSTRUCTION PERMISSION BUT OTHER (READ FIRE) DEPARTMENT NOT GIVING NOC . HENCE THE MANY PEOPLE IN SILVASSA LIKE ME ARE TERRIBLE CONDITIONS. PLEASE ADVISE WHAT WRE LEGAL REMEDIAL MEASURE CAN BE TAKEN.
Y V Vishweshwar Rao
(Expert) 29 September 2010
The Building Permission is issued by the Municipal Corporation after complying the Building Rules with a condition that the Builder has to comply other Regulations/Rules of other Departments like Fire Department for NOC from Fire Depart etc ., The Guide lines of Fire Depart. to be complied by the Builder to obtain NOC from Fire Department .